Services

Planning, reporting, claims, and 4D visualisation across the full project lifecycle — built around clarity, logic, and evidence that stands up to scrutiny.

Programme and Schedule Development
01 — Planning

Programme & Schedule Development

Credible, logic-linked programmes built to withstand scrutiny — from baseline through recovery, across NEC, JCT, and FIDIC contracts.

  • Baseline programme development in Primavera P6 and Asta Power Project
  • Logic validation, sequencing and critical path establishment
  • Interface and milestone planning across multi-discipline packages
  • Recovery programmes and what-if scenario analysis
  • NEC clause 31 and 32 compliant programme submissions
  • Resource and cost loading aligned to contract requirements
Primavera P6 Asta Power Project NEC JCT FIDIC
Progress Reporting
02 — Reporting

Progress Reporting

Clear critical path visibility and stakeholder-ready reporting packs delivered every period — giving all parties a transparent view of programme status.

  • Weekly and monthly programme updates with progress capture
  • Critical path monitoring and early warning identification
  • Stakeholder reporting packs — narrative, Gantt, S-curve
  • Risk and change event integration into the live programme
  • Compensation event and early warning tracking under NEC
  • Client-facing presentation-ready outputs
Weekly Updates Critical Path S-Curve Early Warnings
Delay Analysis and Claims Consultancy
03 — Claims

Delay Analysis & Claims Consultancy

Evidence-led delay analysis and EOT submissions prepared to a standard that holds up in adjudication, arbitration, and litigation.

  • Time Impact Analysis (TIA) — prospective and retrospective
  • As-built programme construction from contemporaneous records
  • Windows analysis and collapsed as-built methodology
  • Extension of Time (EOT) submissions and entitlement advice
  • Concurrency analysis and delay apportionment
  • Expert witness support and report preparation
TIA As-Built Analysis EOT Expert Witness
4D Planning and Visualisation
04 — 4D Planning

4D Planning & Visualisation

Programme logic linked directly to a 3D model — bringing construction sequences to life for better coordination, communication, and risk identification.

  • BIM-integrated programme linking schedule activities to 3D model elements
  • Construction sequence animation for design and logistics review
  • Clash detection and spatial coordination across disciplines
  • Logistics planning — crane positioning, access, material flow
  • Stakeholder communication and client presentation outputs
  • Integration with Primavera P6, Asta, and Navisworks
BIM Navisworks Sequence Visualisation Clash Detection

Typical deliverables

  • Baseline and updated programme files
  • Reporting pack — narrative, critical path, S-curve
  • Change and event log with time impacts
  • Delay analysis report with exhibits
  • EOT submission and entitlement summary
  • 4D model and sequence animation

Tools & software

  • Oracle Primavera P6
  • Asta Power Project
  • Microsoft Project
  • Autodesk Navisworks
  • BIM 360 / Autodesk Construction Cloud
  • Microsoft Excel & Power BI

Contract alignment

  • NEC3 and NEC4 ECC — clause 31, 32, 60
  • JCT Design & Build 2016
  • FIDIC Red, Yellow and Silver Book
  • Bespoke and framework contracts
  • SCL Delay and Disruption Protocol
  • RICS guidance on delay analysis
Discuss your project View our projects